ANALISA RISIKO PADA PROYEK PEMBANGUNAN GEDUNG AUDITORIUM IAIN KOTA AMBON

Authors

  • Tisya Glorya Pelatta Politeknik Negeri Ambon
  • Nelda Maelissa Politeknik Negeri Ambon
  • Henriette Dorothy Titaley Politeknik Negeri Ambon
  • Abraham Tuanakotta Politeknik Negeri Ambon

DOI:

https://doi.org/10.31959/ja.v2i1.1202

Abstract

Risk management is an effort to manage risk comprehensively, planned, and structured in a good system to prevent unexpected risks. It may allow the management to expand results by identifiying and analyzing the risk to work accident in the Auditorium building project in a IAIN Ambon. Each  risk in the work phase must be assessed risk professionally. The assessment method used a risk assessment matrix sourced from NHS Highland, which adopted from AS/NZS 1360:2004 Risk Management. Primary data were obtained from interviews and questionnaires.

 

Furthermore , secondary data were collected through the company’s organizational structure and project work items. In addition, data analysis was carried out through validity and realiability test, and finally, a risk assessment was implemented.

The results of this study showed that there were five risk factors; injured/stabbed by risk level of 20 work accident risk variabels, there was obvioposly one medium risk inculuded in the category high risk and 19 other variables involved in the medium risk included in the category high and 19 other variebles invoveld in the medium risk category. In consclusion,strategiees that can be carried out to prevent the risk regaarding to the classification of risk levels, namely elimination, substitution, administation, and personal protecetive Equipment (PPE).

Published

2023-03-31

How to Cite

Pelatta, T. G., Maelissa, N. ., Titaley, H. D., & Tuanakotta, A. . (2023). ANALISA RISIKO PADA PROYEK PEMBANGUNAN GEDUNG AUDITORIUM IAIN KOTA AMBON . Journal Agregate, 2(1), 107–115. https://doi.org/10.31959/ja.v2i1.1202

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>