Launuru, J., Leuhery, L., & Marantika, M. (2024). OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MTSN 6 MALTENG. Journal Agregate, 3(1), 195–203. https://doi.org/10.31959/ja.v3i1.1907