Cici Amanda Latuconsina, Saleh, L. M. and Gasperz, W. (2024) “ANALISA PENGENDALIAN BIAYA DAN WAKTU PELAKSANAAN PADA PROYEK PEMBANGUNAN RUANG KELAS BARU MIN 5 MALUKU TENGAH DENGAN MENGGUNAKAN METODE NILAI HASIL”, Journal Agregate, 3(1), pp. 126–131. doi: 10.31959/ja.v3i1.2152.