ANALISA PERHITUNGAN RENCANA ANGGARAN BIAYA DAN PENERAPAN MANAJEMEN WAKTU PADA PELAKSANAAN PROYEK REHAB RUMDIS HUBDAM XVI/PATTIMURA – AMBON

Authors

  • Mygthsico Joana Matahelumual Politeknik Negeri Ambon
  • Octovianus Jamlaay Politeknik Negeri Ambon
  • Henriette Dorothy Titaley Politeknik Negeri Ambon

DOI:

https://doi.org/10.31959/ja.v3i1.1818

Abstract

The rehabilitation of the Hubdam XVI/Pattimura Ambon Official Residence was carried out as an improvement to building facilities that were damaged by the movement of the earth's plates (earthquake). Construction work consists of planning a cost budget plan to planning a project implementation schedule. This study aims to calculate the cost budget plan (RAB) and determine which work is included in the critical trajectory. The building cost budget plan (RAB), identifies each work item in the project being calculated based on the 2019 SNI analysis and applies the Critical Path Method (CPM) method. The cost budget plan (RAB) for the Hubdam XVI / Pattimura Ambon official residence rehabilitation project for the total price amount is IDR 2,725,577,390.90 rounded up to IDR 2,725,577,000.00, - and the work items that are passed through the critical path are preparation work, foundation and concrete work, roof work, ceiling work, to painting work.

Published

2024-03-31

How to Cite

Matahelumual, M. J., Jamlaay, O., & Titaley, H. D. (2024). ANALISA PERHITUNGAN RENCANA ANGGARAN BIAYA DAN PENERAPAN MANAJEMEN WAKTU PADA PELAKSANAAN PROYEK REHAB RUMDIS HUBDAM XVI/PATTIMURA – AMBON. Journal Agregate, 3(1), 27–36. https://doi.org/10.31959/ja.v3i1.1818

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>